Latest Construction Progress Updates
11th December 2021
The transformation of Shakespeare Marina
3rd August 2021
Geomac director Neil Warren reveals the proposed entrance to the marina as the final bed levels are established.
7th July 2021
Geomac Director Neil Warren takes a stroll along the river bank from the marina site to the centre of town.
23rd June 2021
Geomac Director Neil Warren walks the plot with independent auditor and site foreman for a weekly progress update.
Mooring poles are in place.
11th June 2021
Geomac Director Neil Warren reminds us that progress is proceding according to schedule and previously excavated material is being repositioned in the basin area.
Final landscape levels are now being formed.
2nd June 2021
The recent rain has meant conditions are not ideal but the crew are a professional team and know their stuff. Piles are being driven in to contain the marina basin.
Topsoil is still being loaded onto temporary tips for future delpoyment around the site.
26th May 2021
Geomac Director Neil Warren explains the hardware and machinery necessary for topsoil removal and storage in preparation for the basin formation with access onto the River Avon.
After this stage will come sheet piling and stabilisation.
27th April 2021
Geomac Director Richard Melhuish christens Shakespeare Marina by digging the first bucket of soil.
The plant has been fired up and we have started the journey of bringing Shakespeare Marina to life.